Project Category:
Location:
Merritt, BC
Objective: Recovery of Thin Gold Bearing Quartz Veins.
Acting as the general contractor, we were responsible for maximizing the recovery of gold ore. We designed a highwall controlled blasting system to increase the overall bench-face angle of the benches and developed systems to recover thin quartz veins. This project involved pre-stripping, water management, rock / waste removal, ore recovery and rock waste dump reclamation.
Weight:
-17